Spacing unit · McKenzie County
1,280-acre Bakken spacing unit
T151N R95W sections 25, 36
Unit facts
- Formation
- Bakken
- Acres
- 1,280
- Type
- Spacing unit
- Land described
- T151N R95W sections 25, 36
- Pool
- Clarks Creek-Bakken
- Zone
- Zone XIII
- County
- McKenzie County
- Surveyed wells inside
- 26
- Most wells operated by
- SPOTTED HAWK DEVELOPMENT, LLC
- Unit id
dsu-0a89db8a32ac8a88c88f- Laterals that still fit (Nov 2026 method)
- 0
- Neighbourhood target density
- 10.55 two-mile laterals per 1,280 acres
- Density drilled so far
- 11.22 per 1,280 acres
Room to drill: 0 laterals still fit at the density this unit's neighbourhood has reached (the larger of the 75th percentile of mature units within 10 miles and the median of units drilled in the last three years), placed in the widest gaps with the setbacks of the November 2026 method. Machine-made and geometric: not a commitment to drill, not a permit, order, lease or plan, and no economics. Land is counted once, so a unit under a larger unit shows only what the larger one left. How it is computed.
Map
DMR footprint (NAD83) with the published surface locations of its wells. Laterals run under the unit; pads often sit on a neighbouring section.
Wells inside the unit
| Well | Operator | Status | Lateral inside |
|---|---|---|---|
| RUBY 31-30HEL | DEVON ENERGY WILLISTON, L.L.C. | Active (A) | 9,814 ft100% |
| RUBY 31-30HS2 | DEVON ENERGY WILLISTON, L.L.C. | Active (A) | 9,771 ft100% |
| RUBY 31-30HW | DEVON ENERGY WILLISTON, L.L.C. | Active (A) | 9,769 ft100% |
| RUBY 31-30HX | DEVON ENERGY WILLISTON, L.L.C. | Active (A) | 9,752 ft100% |
| RUBY 31-30HA | DEVON ENERGY WILLISTON, L.L.C. | Active (A) | 9,735 ft100% |
| RUBY 31-30HB | DEVON ENERGY WILLISTON, L.L.C. | Inactive (IA) | 9,451 ft100% |
| WEST CLARK 2-2425H | EOG RESOURCES, INC. | Active (A) | 5,082 ft62% |
| WEST CLARK 101-2425H | EOG RESOURCES, INC. | Active (A) | 5,081 ft44% |
| WEST CLARK 5-2425H | EOG RESOURCES, INC. | Inactive (IA) | 5,072 ft62% |
| LUKE 13-36H | SPOTTED HAWK DEVELOPMENT, LLC | Plugged and abandoned (PA) | 3,408 ft48% |
| WEST CLARK 4-2425H | EOG RESOURCES, INC. | Active (A) | 2,716 ft29% |
| BULLET 12-36H | SPOTTED HAWK DEVELOPMENT, LLC | Active (A) | 2,257 ft50% |
| BUCKY 13-36H | SPOTTED HAWK DEVELOPMENT, LLC | Active (A) | 2,256 ft50% |
| MATTIE 13-36H | SPOTTED HAWK DEVELOPMENT, LLC | Inactive (IA) | 2,252 ft49% |
| MAGNUM 36-12-MB2 | SPOTTED HAWK DEVELOPMENT, LLC | Inactive (IA) | 2,250 ft53% |
| MAGNUM 36-13-TF2 | SPOTTED HAWK DEVELOPMENT, LLC | Plugged and abandoned (PA) | 2,250 ft51% |
| THUD 12-36H | SPOTTED HAWK DEVELOPMENT, LLC | Inactive (IA) | 2,249 ft53% |
| MARC 13-36H | SPOTTED HAWK DEVELOPMENT, LLC | Active (A) | 2,247 ft52% |
| HAMMER 12-36H | SPOTTED HAWK DEVELOPMENT, LLC | Active (A) | 2,245 ft52% |
| MAGNUM 36-11-TF2 | SPOTTED HAWK DEVELOPMENT, LLC | Plugged and abandoned (PA) | 2,242 ft51% |
| AVALANCHE 36-15-TF1 | SPOTTED HAWK DEVELOPMENT, LLC | Plugged and abandoned (PA) | 2,240 ft51% |
| AVALANCHE 36-16-MB2 | SPOTTED HAWK DEVELOPMENT, LLC | Plugged and abandoned (PA) | 2,240 ft49% |
| CANON 12-36H | SPOTTED HAWK DEVELOPMENT, LLC | Active (A) | 2,240 ft44% |
| AVALANCHE 36-14-MB2 | SPOTTED HAWK DEVELOPMENT, LLC | Inactive (IA) | 2,238 ft52% |
| AVALANCHE 36-17-TF2 | SPOTTED HAWK DEVELOPMENT, LLC | Plugged and abandoned (PA) | 2,227 ft49% |
| FOREMAN 36-35-1-2LL | OASIS PETROLEUM NORTH AMERICA LLC | Active (A) | 1,416 ft16% |
Surveyed Bakken-system laterals with at least 660 ft of plan-view length inside the published footprint. Geometric membership, not a legal assignment; a lateral can cross several units.
Order history
- Order 29336Case 26894Designated the spacing unitBRUIN E&P OPERATING, LLC
- Order 29709Case 27262Established the spacing unitWPX ENERGY WILLISTON, LLC
- Order 29865Case 27421Pooled all interests in the unitWPX ENERGY WILLISTON, LLC
- Order 34574Case 31837Designated the spacing unitEOG RESOURCES, INC.
Facts extracted from signed NDIC orders whose land description covers this footprint; machine-extracted and not human-reviewed. A stated allowance is what that order allowed, not proof that it governs today.
Overlapping units
10 other units share a surveyed well with this one; overlapping units are not additive.
- Footprint 2ebe060d 1,440-acre Bakken spacing unit
- T150N R95W sections 1, 2, 11, 12 2,560-acre Bakken spacing unit
- T150N R95W section 1 1,280-acre Bakken spacing unit
- T151N R95W section 36 640-acre Bakken spacing unit
- T151N R94W sections 30, 31 1,280-acre Bakken spacing unit
- T151N R94W sections 29, 30, 31, 32 2,560-acre Bakken spacing unit
- T151N R95W sections 13, 24 1,920-acre Bakken spacing unit
- T151N R95W sections 34, 35 1,280-acre Bakken spacing unit
- T151N R95W sections 35, 36 2,560-acre Bakken spacing unit
- T150N R95W sections 1, 2 1,280-acre Bakken spacing unit