BBakken SubsurfaceNorth Dakota well index

Spacing unit · Divide County

2,560-acre Bakken spacing unit

T163N R100W sections 3, 4, 9, 10

Spacing unit1 wells allowed · order 22099West Ambrose-Bakken

Unit facts

Formation
Bakken
Acres
2,560
Type
Spacing unit
Land described
T163N R100W sections 3, 4, 9, 10
Pool
West Ambrose-Bakken
Zone
Zone IX
County
Divide County
Surveyed wells inside
17
Most wells operated by
Petro-Hunt
Unit id
dsu-1519482f31375c174c8c
Wells allowed by the latest linked order
1
Wells assigned to this unit
0
Pending permits inside
0
Balance under the allowance
-16
First linked order
Jul 5, 2013
Laterals that still fit (Nov 2026 method)
0
Neighbourhood target density
5.14 two-mile laterals per 1,280 acres
Density drilled so far
7.98 per 1,280 acres

Room to drill: 0 laterals still fit at the density this unit's neighbourhood has reached (the larger of the 75th percentile of mature units within 10 miles and the median of units drilled in the last three years), placed in the widest gaps with the setbacks of the November 2026 method. Machine-made and geometric: not a commitment to drill, not a permit, order, lease or plan, and no economics. Land is counted once, so a unit under a larger unit shows only what the larger one left. How it is computed.

Map

TORGESON 2B-15HNTORGESON 2-15HNVIRGIL 2B-16HNTORGESON 1-15HRM FEDERAL 4-15HNBDK FEDERAL 4-15HNARJ FEDERAL 4B-15HNHEATHER 1B-15HNBEVERLY 2-16HNINEZ 1B-16HNWOLTER 13-9HROLIE 1-16HNRALPH 1-17HNRUFUS 13B-9HNJEREMY FEDERAL 14B-10HNSMOKEY 14B-9HNNANCY 4-14HN1 mi

DMR footprint (NAD83) with the published surface locations of its wells. Laterals run under the unit; pads often sit on a neighbouring section.

Wells inside the unit

WellOperatorStatusLateral inside
TORGESON 2B-15HNPETRO-HUNT, L.L.C.Active (A)10,319 ft100%
TORGESON 2-15HNPETRO-HUNT, L.L.C.Active (A)10,226 ft100%
VIRGIL 2B-16HNPETRO-HUNT, L.L.C.Active (A)10,225 ft100%
TORGESON 1-15HPETRO-HUNT, L.L.C.Active (A)10,218 ft100%
RM FEDERAL 4-15HNBPETRO-HUNT, L.L.C.Active (A)10,177 ft100%
DK FEDERAL 4-15HNAPETRO-HUNT, L.L.C.Active (A)10,165 ft100%
RJ FEDERAL 4B-15HNPETRO-HUNT, L.L.C.Active (A)10,144 ft100%
HEATHER 1B-15HNPETRO-HUNT, L.L.C.Active (A)10,136 ft100%
BEVERLY 2-16HNPETRO-HUNT, L.L.C.Active (A)10,098 ft100%
INEZ 1B-16HNPETRO-HUNT, L.L.C.Active (A)10,024 ft100%
WOLTER 13-9HPETRO-HUNT, L.L.C.Active (A)10,003 ft100%
ROLIE 1-16HNPETRO-HUNT, L.L.C.Active (A)9,969 ft100%
RALPH 1-17HNPETRO-HUNT, L.L.C.Active (A)9,803 ft95%
RUFUS 13B-9HNPETRO-HUNT, L.L.C.Temporarily abandoned (TA)9,757 ft100%
JEREMY FEDERAL 14B-10HNPETRO-HUNT, L.L.C.Active (A)9,708 ft100%
SMOKEY 14B-9HNPETRO-HUNT, L.L.C.Abandoned (AB)9,617 ft100%
NANCY 4-14HNPETRO-HUNT, L.L.C.Active (A)8,656 ft86%

Surveyed Bakken-system laterals with at least 660 ft of plan-view length inside the published footprint. Geometric membership, not a legal assignment; a lateral can cross several units.

Order history

  1. Order 22099Case 19792Established the spacing unit, 1 well allowedSM ENERGY CO.
  2. Order 22099Case 19792Designated the spacing unitSM ENERGY CO.
  3. Order 24438Case 22104Pooled all interests in the unitSM ENERGY CO.
  4. Order 33458Case 30798Designated the spacing unitMUREX PETROLEUM CORP.

Facts extracted from signed NDIC orders whose land description covers this footprint; machine-extracted and not human-reviewed. A stated allowance is what that order allowed, not proof that it governs today.

Overlapping units

6 other units share a surveyed well with this one; overlapping units are not additive.