Spacing unit · Billings County
320-acre Bakken spacing unit
T143N R102W section 28
Unit facts
- Formation
- Bakken
- Acres
- 320
- Type
- Spacing unit
- Land described
- T143N R102W section 28
- Pool
- Roosevelt-Bakken
- Zone
- Zone III
- County
- Billings County
- Surveyed wells inside
- 2
- Most wells operated by
- FOUNDATION ENERGY MANAGEMENT, LLC
- Unit id
dsu-2ae5ce1d884dda1364f6- Laterals that still fit (Nov 2026 method)
- 0
- Neighbourhood target density
- 2.61 two-mile laterals per 1,280 acres
- Density drilled so far
- 0.94 per 1,280 acres
Room to drill: 0 laterals still fit at the density this unit's neighbourhood has reached (the larger of the 75th percentile of mature units within 10 miles and the median of units drilled in the last three years), placed in the widest gaps with the setbacks of the November 2026 method. 1 more would fit the density but not the spacing rule. The county or basin value stands in for the target because fewer than eight developed units lie within 20 miles. Machine-made and geometric: not a commitment to drill, not a permit, order, lease or plan, and no economics. Land is counted once, so a unit under a larger unit shows only what the larger one left. How it is computed.
Map
DMR footprint (NAD83) with the published surface locations of its wells. Laterals run under the unit; pads often sit on a neighbouring section.
Wells inside the unit
| Well | Operator | Status | Lateral inside |
|---|---|---|---|
| MOSSER 14-22H | FOUNDATION ENERGY MANAGEMENT, LLC | Active (A) | 3,604 ft30% |
| TITAN FEDERAL 1-28 | ABRAXAS PETROLEUM CORP. | Plugged and abandoned (PA) | 2,455 ft100% |
Surveyed Bakken-system laterals with at least 660 ft of plan-view length inside the published footprint. Geometric membership, not a legal assignment; a lateral can cross several units.
Order history
- Order 14174Case 11976Designated the spacing unitWHITING OIL & GAS CORP.
- Order 29703Case 27256Designated the spacing unit
Facts extracted from signed NDIC orders whose land description covers this footprint; machine-extracted and not human-reviewed. A stated allowance is what that order allowed, not proof that it governs today.
Overlapping units
2 other units share a surveyed well with this one; overlapping units are not additive.
- T143N R102W sections 28, 33 1,280-acre Bakken spacing unit
- T143N R102W sections 15, 22 1,280-acre Bakken spacing unit