Spacing unit · Mountrail County
1,280-acre Bakken spacing unit
T155N R91W sections 18, 19
Unit facts
- Formation
- Bakken
- Acres
- 1,280
- Type
- Spacing unit
- Land described
- T155N R91W sections 18, 19
- Pool
- Stanley-Bakken
- Zone
- Zone XVI
- County
- Mountrail County
- Surveyed wells inside
- 11
- Most wells operated by
- Lime Rock III-A
- Unit id
dsu-52b3f9c17e7caf40b226- Wells allowed by the latest linked order
- 14
- Wells assigned to this unit
- 11
- Pending permits inside
- 0
- Balance under the allowance
- +3
- First linked order
- May 21, 2009
- Laterals that still fit (Nov 2026 method)
- 0
- Neighbourhood target density
- 8.36 two-mile laterals per 1,280 acres
- Density drilled so far
- 10.67 per 1,280 acres
Room to drill: 0 laterals still fit at the density this unit's neighbourhood has reached (the larger of the 75th percentile of mature units within 10 miles and the median of units drilled in the last three years), placed in the widest gaps with the setbacks of the November 2026 method. Machine-made and geometric: not a commitment to drill, not a permit, order, lease or plan, and no economics. Land is counted once, so a unit under a larger unit shows only what the larger one left. How it is computed.
Map
DMR footprint (NAD83) with the published surface locations of its wells. Laterals run under the unit; pads often sit on a neighbouring section.
Wells inside the unit
| Well | Operator | Status | Lateral inside |
|---|---|---|---|
| SANDY 18-19H | LIME ROCK RESOURCES III-A, L.P. | Dry hole (DRY) | 10,746 ft100% |
| Hansen B 18-19-3TFH | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 10,466 ft100% |
| HANSEN 18-19-2H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 10,444 ft100% |
| SANDY 18-19-2H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 10,358 ft100% |
| HANSEN B 18-19-1H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 10,336 ft100% |
| SANDY 18-19-3TFH | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 10,298 ft100% |
| HANSEN B 18-19-2TFH | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 10,291 ft100% |
| HANSEN 18-19-1H RD | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 10,019 ft100% |
| HANSEN 18-19H | LIME ROCK RESOURCES III-A, L.P. | Plugged and abandoned (PA) | 9,554 ft100% |
| HARSTAD 18-19H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 8,657 ft100% |
| LORI 18-19H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 8,160 ft100% |
Surveyed Bakken-system laterals with at least 660 ft of plan-view length inside the published footprint. Geometric membership, not a legal assignment; a lateral can cross several units.
Order history
- Order 13085Case 11046Designated the spacing unitEOG RESOURCES, INC.
- Order 13107Case 11066Established the spacing unit, 2 wells allowedFIDELITY EXPL. & PROD. CO.
- Order 13531Case 11422Designated the spacing unitMUREX PETROLEUM CORP.
- Order 17074Case 14798Designated the spacing unit, 3 wells allowedFIDELITY EXPLORATION & PRODUCTION CO.
- Order 17080Case 14804Established the spacing unit, 3 wells allowedFIDELITY EXPLORATION & PRODUCTION CO.
- Order 18016Case 15761Designated the spacing unit, 4 wells allowedARSENAL ENERGY USA INC.
- Order 19116Case 16846Established the spacing unit, 4 wells allowedFIDELITY EXPLORATION & PRODUCTION CO.
- Order 26353Case 24010Designated the spacing unit, 14 wells allowedEOG RESOURCES, INC.
- Order 26726Case 24361Established the spacing unit, 14 wells allowedLIME ROCK RESOURCES III-A, LP
Facts extracted from signed NDIC orders whose land description covers this footprint; machine-extracted and not human-reviewed. A stated allowance is what that order allowed, not proof that it governs today.
Overlapping units
2 other units share a surveyed well with this one; overlapping units are not additive.
- T155N R92W sections 13, 24 2,560-acre Bakken spacing unit
- T155N R91W sections 17, 18, 19, 20 2,560-acre Bakken spacing unit