Spacing unit · Mountrail County
2,560-acre Bakken spacing unit
T155N R91W sections 27, 28, 33, 34
Unit facts
- Formation
- Bakken
- Acres
- 2,560
- Type
- Spacing unit
- Land described
- T155N R91W sections 27, 28, 33, 34
- Pool
- Stanley-Bakken
- Zone
- Zone XXVI
- County
- Mountrail County
- Surveyed wells inside
- 13
- Most wells operated by
- Lime Rock III-A
- Unit id
dsu-73a03da21d9f72579faa- Wells allowed by the latest linked order
- 3
- Wells assigned to this unit
- 3
- Pending permits inside
- 0
- Balance under the allowance
- -10
- First linked order
- Oct 12, 2011
- Laterals that still fit (Nov 2026 method)
- 0
- Neighbourhood target density
- 8.37 two-mile laterals per 1,280 acres
- Density drilled so far
- 5.56 per 1,280 acres
Room to drill: 0 laterals still fit at the density this unit's neighbourhood has reached (the larger of the 75th percentile of mature units within 10 miles and the median of units drilled in the last three years), placed in the widest gaps with the setbacks of the November 2026 method. Machine-made and geometric: not a commitment to drill, not a permit, order, lease or plan, and no economics. Land is counted once, so a unit under a larger unit shows only what the larger one left. How it is computed.
Map
DMR footprint (NAD83) with the published surface locations of its wells. Laterals run under the unit; pads often sit on a neighbouring section.
Wells inside the unit
| Well | Operator | Status | Lateral inside |
|---|---|---|---|
| MINOT STATE 34-33-28H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 10,661 ft100% |
| CJ 27-34H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 10,378 ft100% |
| CHICO 28-33-1TFH | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 10,286 ft100% |
| H REID TTT 33-28H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 10,078 ft100% |
| TTT RANCH 33-28H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 10,040 ft100% |
| BISMARCK STATE 34-27-28H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 9,911 ft100% |
| STATE 34-33-28H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 9,472 ft100% |
| CRAFT 27-34H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 9,383 ft100% |
| MYHRA 28-33H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 9,342 ft100% |
| TTT RANCH 34-27XH | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 9,176 ft100% |
| HANK 28-33H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 8,444 ft100% |
| CARISSA 27-34H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 6,481 ft100% |
| EVAN TTT 41-4HU | WHITING OIL AND GAS CORPORATION | Active (A) | 4,064 ft41% |
Surveyed Bakken-system laterals with at least 660 ft of plan-view length inside the published footprint. Geometric membership, not a legal assignment; a lateral can cross several units.
Order history
- Order 17074Case 14798Established the spacing unit, 1 well allowedFIDELITY EXPLORATION & PRODUCTION CO.
- Order 17074Case 14798Designated the spacing unitFIDELITY EXPLORATION & PRODUCTION CO.
- Order 20586Case 18317Pooled all interests in the unitFIDELITY EXPLORATION & PRODUCTION CO.
- Order 21144Case 18843Designated the spacing unitEOG RESOURCES, INC.
- Order 21772Case 19470Designated the spacing unit, 3 wells allowedHESS CORP.
- Order 22283Case 19976Established the spacing unit, 3 wells allowedFIDELITY EXPLORATION & PRODUCTION CO.
Facts extracted from signed NDIC orders whose land description covers this footprint; machine-extracted and not human-reviewed. A stated allowance is what that order allowed, not proof that it governs today.
Overlapping units
10 other units share a surveyed well with this one; overlapping units are not additive.
- T155N R91W sections 29, 30, 31, 32 2,560-acre Bakken spacing unit
- T155N R91W sections 29, 32 1,280-acre Bakken spacing unit
- T155N R91W sections 28, 33 1,280-acre Bakken spacing unit
- T154N R91W sections 3, 4, 9, 10 2,560-acre Bakken spacing unit
- T155N R91W sections 28, 29, 32, 33 2,560-acre Bakken spacing unit
- T155N R91W sections 27, 34 1,280-acre Bakken spacing unit
- T155N R91W section 32 640-acre Bakken spacing unit
- T154N R91W sections 4, 5 1,280-acre Bakken spacing unit
- T155N R91W sections 32, 33 2,560-acre Bakken spacing unit
- T154N R91W sections 4, 5, 8, 9 2,560-acre Bakken spacing unit