Spacing unit · Divide County
1,280-acre Bakken spacing unit
T162N R99W sections 25, 36
Unit facts
- Formation
- Bakken
- Acres
- 1,280
- Type
- Spacing unit
- Land described
- T162N R99W sections 25, 36
- Pool
- Ambrose-Bakken
- Zone
- Zone VIII
- County
- Divide County
- Surveyed wells inside
- 2
- Most wells operated by
- SM ENERGY COMPANY
- Unit id
dsu-8d9f76c8fbd98509082e- Wells allowed by the latest linked order
- 7
- Wells assigned to this unit
- 1
- Pending permits inside
- 0
- Balance under the allowance
- +5
- First linked order
- Sep 27, 2013
- Laterals that still fit (Nov 2026 method)
- 0
- Neighbourhood target density
- 4.21 two-mile laterals per 1,280 acres
- Density drilled so far
- 1.46 per 1,280 acres
Room to drill: 0 laterals still fit at the density this unit's neighbourhood has reached (the larger of the 75th percentile of mature units within 10 miles and the median of units drilled in the last three years), placed in the widest gaps with the setbacks of the November 2026 method. 3 more would fit the density but not the spacing rule. Machine-made and geometric: not a commitment to drill, not a permit, order, lease or plan, and no economics. Land is counted once, so a unit under a larger unit shows only what the larger one left. How it is computed.
Map
DMR footprint (NAD83) with the published surface locations of its wells. Laterals run under the unit; pads often sit on a neighbouring section.
Wells inside the unit
| Well | Operator | Status | Lateral inside |
|---|---|---|---|
| LYSTAD 1-25HS | PETRO-HUNT, L.L.C. | Active (A) | 9,651 ft100% |
| FURHMAN 36-162-99H | SM ENERGY COMPANY | Plugged and abandoned (PA) | 5,826 ft100% |
Surveyed Bakken-system laterals with at least 660 ft of plan-view length inside the published footprint. Geometric membership, not a legal assignment; a lateral can cross several units.
Order history
- Order 22960Case 20655Established the spacing unit, 7 wells allowedBAYTEX ENERGY USA LTD.
- Order 26017Case 23676Pooled all interests in the unitSM ENERGY CO.
Facts extracted from signed NDIC orders whose land description covers this footprint; machine-extracted and not human-reviewed. A stated allowance is what that order allowed, not proof that it governs today.
Overlapping units
One other unit shares a surveyed well with this one; overlapping units are not additive.
- T162N R99W section 36 640-acre Bakken spacing unit