Spacing unit · Mountrail County
640-acre Bakken spacing unit
T158N R92W section 5
Unit facts
- Formation
- Bakken
- Acres
- 640
- Type
- Spacing unit
- Land described
- T158N R92W section 5
- Pool
- Cottonwood-Bakken
- Zone
- Zone I
- County
- Mountrail County
- Surveyed wells inside
- 3
- Most wells operated by
- Silver Hill Energy Operating, LLC
- Unit id
dsu-d6c0b94bcf3198ec10c0- Laterals that still fit (Nov 2026 method)
- 1 (0.48 two-mile equivalents)
- Neighbourhood target density
- 4.47 two-mile laterals per 1,280 acres
- Density drilled so far
- 2.36 per 1,280 acres
Room to drill: 1 lateral still fit at the density this unit's neighbourhood has reached (the larger of the 75th percentile of mature units within 10 miles and the median of units drilled in the last three years), placed in the widest gaps with the setbacks of the November 2026 method. 1 more would fit the density but not the spacing rule. Machine-made and geometric: not a commitment to drill, not a permit, order, lease or plan, and no economics. Land is counted once, so a unit under a larger unit shows only what the larger one left. How it is computed.
Map
DMR footprint (NAD83) with the published surface locations of its wells. Laterals run under the unit; pads often sit on a neighbouring section.
Wells inside the unit
| Well | Operator | Status | Lateral inside |
|---|---|---|---|
| LEDENE 44-5H | OASIS PETROLEUM NORTH AMERICA LLC | Inactive (IA) | 5,528 ft100% |
| NEBRASKA E 158-92-5-29-3MBHX | Silver Hill Energy Operating, LLC | Active (A) | 5,000 ft32% |
| NEBRASKA E 158-92-5-29-20MBHX | Silver Hill Energy Operating, LLC | Active (A) | 1,917 ft12% |
Surveyed Bakken-system laterals with at least 660 ft of plan-view length inside the published footprint. Geometric membership, not a legal assignment; a lateral can cross several units.
Order history
- Order 12529Case 10591Pooled all interests in the unitFIDELITY EXPL. & PROD. CO.
Facts extracted from signed NDIC orders whose land description covers this footprint; machine-extracted and not human-reviewed. A stated allowance is what that order allowed, not proof that it governs today.
Overlapping units
5 other units share a surveyed well with this one; overlapping units are not additive.
- T159N R92W sections 28, 33 1,920-acre Bakken spacing unit
- T159N R92W sections 28, 29, 32, 33 3,840-acre Bakken spacing unit
- T158N R92W sections 4, 9 1,280-acre Bakken spacing unit
- T158N R92W sections 5, 6, 7, 8 2,560-acre Bakken spacing unit
- T159N R92W sections 29, 32 1,920-acre Bakken spacing unit