Spacing unit · Burke County
2,560-acre Bakken spacing unit
T160N R90W sections 7, 8, 16, 17
Unit facts
- Formation
- Bakken
- Acres
- 2,560
- Type
- Spacing unit
- Land described
- T160N R90W sections 7, 8, 16, 17
- Pool
- Dimond-Bakken
- Zone
- Zone VIII
- County
- Burke County
- Surveyed wells inside
- 4
- Most wells operated by
- Lime Rock III-A
- Unit id
dsu-dd47ae98a28f4ced472e- Wells allowed by the latest linked order
- 3
- Wells assigned to this unit
- 0
- Pending permits inside
- 0
- Balance under the allowance
- -1
- First linked order
- Feb 4, 2019
- Laterals that still fit (Nov 2026 method)
- 0
- Neighbourhood target density
- 3.73 two-mile laterals per 1,280 acres
- Density drilled so far
- 1 per 1,280 acres
Room to drill: 0 laterals still fit at the density this unit's neighbourhood has reached (the larger of the 75th percentile of mature units within 10 miles and the median of units drilled in the last three years), placed in the widest gaps with the setbacks of the November 2026 method. 2 more would fit the density but not the spacing rule. Machine-made and geometric: not a commitment to drill, not a permit, order, lease or plan, and no economics. Land is counted once, so a unit under a larger unit shows only what the larger one left. How it is computed.
Map
DMR footprint (NAD83) with the published surface locations of its wells. Laterals run under the unit; pads often sit on a neighbouring section.
Wells inside the unit
| Well | Operator | Status | Lateral inside |
|---|---|---|---|
| HIGH RIDGE 8-5-1H-160-90 | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 5,615 ft46% |
| MAD HATTER 16-4H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 5,601 ft100% |
| KANNEGIETER 160-90-17 P-1H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 5,160 ft100% |
| SORLIE 160-90-7-P16-1H | LIME ROCK RESOURCES III-A, L.P. | Active (A) | 4,479 ft100% |
Surveyed Bakken-system laterals with at least 660 ft of plan-view length inside the published footprint. Geometric membership, not a legal assignment; a lateral can cross several units.
Order history
- Order 29477Case 27031Established the spacing unit, 3 wells allowedLIME ROCK RESOURCES III-A, LP
- Order 29594Case 27147Pooled all interests in the unitLIME ROCK RESOURCES III-A, L.P.
Facts extracted from signed NDIC orders whose land description covers this footprint; machine-extracted and not human-reviewed. A stated allowance is what that order allowed, not proof that it governs today.
Overlapping units
5 other units share a surveyed well with this one; overlapping units are not additive.
- T160N R90W section 7 640-acre Bakken spacing unit
- Footprint 813b2afa 640-acre Bakken spacing unit
- T160N R90W sections 8, 9, 15, 16 2,560-acre Bakken spacing unit
- Footprint a7b21d14 640-acre Bakken spacing unit
- T160N R90W sections 5, 8 1,280-acre Bakken spacing unit