Spacing unit · Mountrail County
640-acre Bakken spacing unit
T156N R92W section 28
Unit facts
- Formation
- Bakken
- Acres
- 640
- Type
- Spacing unit
- Land described
- T156N R92W section 28
- Pool
- Alger-Bakken
- Zone
- Zone II
- County
- Mountrail County
- Surveyed wells inside
- 3
- Most wells operated by
- EOG RESOURCES, INC.
- Unit id
dsu-e7c04e37bbe164cf9201- Laterals that still fit (Nov 2026 method)
- 1 (0.48 two-mile equivalents)
- Neighbourhood target density
- 8.02 two-mile laterals per 1,280 acres
- Density drilled so far
- 2.31 per 1,280 acres
Room to drill: 1 lateral still fit at the density this unit's neighbourhood has reached (the larger of the 75th percentile of mature units within 10 miles and the median of units drilled in the last three years), placed in the widest gaps with the setbacks of the November 2026 method. 3 more would fit the density but not the spacing rule. Machine-made and geometric: not a commitment to drill, not a permit, order, lease or plan, and no economics. Land is counted once, so a unit under a larger unit shows only what the larger one left. How it is computed.
Map
DMR footprint (NAD83) with the published surface locations of its wells. Laterals run under the unit; pads often sit on a neighbouring section.
Wells inside the unit
| Well | Operator | Status | Lateral inside |
|---|---|---|---|
| ROSS 15-28H | EOG RESOURCES, INC. | Active (A) | 5,085 ft100% |
| ROSS 27-2728H | EOG RESOURCES, INC. | Active (A) | 3,729 ft60% |
| SCHA 33-34 XN 1H | DEVON ENERGY WILLISTON, L.L.C. | Active (A) | 3,438 ft34% |
Surveyed Bakken-system laterals with at least 660 ft of plan-view length inside the published footprint. Geometric membership, not a legal assignment; a lateral can cross several units.
Order history
- Order 13412Case 11308Extended the spacing unitEOG RESOURCES, INC.
- Order 13642Case 11518Pooled all interests in the unitEOG RESOURCES, INC.
Facts extracted from signed NDIC orders whose land description covers this footprint; machine-extracted and not human-reviewed. A stated allowance is what that order allowed, not proof that it governs today.
Overlapping units
6 other units share a surveyed well with this one; overlapping units are not additive.
- T156N R92W sections 27, 28, 33, 34 2,560-acre Bakken spacing unit
- T156N R92W section 27 640-acre Bakken spacing unit
- T156N R92W sections 27, 28 1,280-acre Bakken spacing unit
- T156N R92W sections 33, 34 1,280-acre Bakken spacing unit
- T156N R92W sections 34, 35 2,560-acre Bakken spacing unit
- T156N R92W sections 20, 21, 22, 27, 28, 29 3,840-acre Bakken spacing unit