BBakken SubsurfaceNorth Dakota well index

Spacing unit · Mountrail County

640-acre Bakken spacing unit

T156N R92W section 28

Spacing unitAlger-Bakken

Unit facts

Formation
Bakken
Acres
640
Type
Spacing unit
Land described
T156N R92W section 28
Pool
Alger-Bakken
Zone
Zone II
County
Mountrail County
Surveyed wells inside
3
Most wells operated by
EOG RESOURCES, INC.
Unit id
dsu-e7c04e37bbe164cf9201
Laterals that still fit (Nov 2026 method)
1 (0.48 two-mile equivalents)
Neighbourhood target density
8.02 two-mile laterals per 1,280 acres
Density drilled so far
2.31 per 1,280 acres

Room to drill: 1 lateral still fit at the density this unit's neighbourhood has reached (the larger of the 75th percentile of mature units within 10 miles and the median of units drilled in the last three years), placed in the widest gaps with the setbacks of the November 2026 method. 3 more would fit the density but not the spacing rule. Machine-made and geometric: not a commitment to drill, not a permit, order, lease or plan, and no economics. Land is counted once, so a unit under a larger unit shows only what the larger one left. How it is computed.

Map

ROSS 15-28HROSS 27-2728HSCHA 33-34 XN 1H1 mi

DMR footprint (NAD83) with the published surface locations of its wells. Laterals run under the unit; pads often sit on a neighbouring section.

Wells inside the unit

WellOperatorStatusLateral inside
ROSS 15-28HEOG RESOURCES, INC.Active (A)5,085 ft100%
ROSS 27-2728HEOG RESOURCES, INC.Active (A)3,729 ft60%
SCHA 33-34 XN 1HDEVON ENERGY WILLISTON, L.L.C.Active (A)3,438 ft34%

Surveyed Bakken-system laterals with at least 660 ft of plan-view length inside the published footprint. Geometric membership, not a legal assignment; a lateral can cross several units.

Order history

  1. Order 13412Case 11308Extended the spacing unitEOG RESOURCES, INC.
  2. Order 13642Case 11518Pooled all interests in the unitEOG RESOURCES, INC.

Facts extracted from signed NDIC orders whose land description covers this footprint; machine-extracted and not human-reviewed. A stated allowance is what that order allowed, not proof that it governs today.

Overlapping units

6 other units share a surveyed well with this one; overlapping units are not additive.