BBakken SubsurfaceNorth Dakota well index

Spacing unit · Williams County

1,920-acre Bakken spacing unit

T159N R96W sections 21, 28, 33

Spacing unit5 wells allowed · order 34969Temple-Bakken

Unit facts

Formation
Bakken
Acres
1,920
Type
Spacing unit
Land described
T159N R96W sections 21, 28, 33
Pool
Temple-Bakken
Zone
Zone VI
County
Williams County
Surveyed wells inside
1
Most wells operated by
Continental Resources
Unit id
dsu-f76ba2e6e026585f7a2e
Wells allowed by the latest linked order
5
Wells assigned to this unit
0
Pending permits inside
0
Balance under the allowance
+4
First linked order
Dec 4, 2025
Laterals that still fit (Nov 2026 method)
0
Neighbourhood target density
5.49 two-mile laterals per 1,280 acres
Density drilled so far
0.61 per 1,280 acres

Room to drill: 0 laterals still fit at the density this unit's neighbourhood has reached (the larger of the 75th percentile of mature units within 10 miles and the median of units drilled in the last three years), placed in the widest gaps with the setbacks of the November 2026 method. 2 more would fit the density but not the spacing rule. Machine-made and geometric: not a commitment to drill, not a permit, order, lease or plan, and no economics. Land is counted once, so a unit under a larger unit shows only what the larger one left. How it is computed.

Map

GREENAWALT 1-33H1 mi

DMR footprint (NAD83) with the published surface locations of its wells. Laterals run under the unit; pads often sit on a neighbouring section.

Wells inside the unit

WellOperatorStatusLateral inside
GREENAWALT 1-33HCONTINENTAL RESOURCES, INC.Active (A)9,694 ft100%

Surveyed Bakken-system laterals with at least 660 ft of plan-view length inside the published footprint. Geometric membership, not a legal assignment; a lateral can cross several units.

Order history

  1. Order 34619Case 31877Established the spacing unit, 5 wells allowedCONTINENTAL RESOURCES, INC.
  2. Order 34650Case 31908Pooled all interests in the unitCONTINENTAL RESOURCES, INC.

Facts extracted from signed NDIC orders whose land description covers this footprint; machine-extracted and not human-reviewed. A stated allowance is what that order allowed, not proof that it governs today.

Overlapping units

3 other units share a surveyed well with this one; overlapping units are not additive.