Spacing unit · Williams County
2,560-acre Bakken spacing unit
T154N R100W sections 15, 16, 21, 22
Unit facts
- Formation
- Bakken
- Acres
- 2,560
- Type
- Spacing unit
- Land described
- T154N R100W sections 15, 16, 21, 22
- Pool
- Catwalk-Bakken
- Zone
- Zone IX
- County
- Williams County
- Surveyed wells inside
- 17
- Most wells operated by
- CONTINENTAL RESOURCES, INC.
- Unit id
dsu-f3b25ee221a2f808320b- Laterals that still fit (Nov 2026 method)
- 0
- Neighbourhood target density
- 7.82 two-mile laterals per 1,280 acres
- Density drilled so far
- 4.87 per 1,280 acres
Room to drill: 0 laterals still fit at the density this unit's neighbourhood has reached (the larger of the 75th percentile of mature units within 10 miles and the median of units drilled in the last three years), placed in the widest gaps with the setbacks of the November 2026 method. Machine-made and geometric: not a commitment to drill, not a permit, order, lease or plan, and no economics. Land is counted once, so a unit under a larger unit shows only what the larger one left. How it is computed.
Map
DMR footprint (NAD83) with the published surface locations of its wells. Laterals run under the unit; pads often sit on a neighbouring section.
Wells inside the unit
| Well | Operator | Status | Lateral inside |
|---|---|---|---|
| JENNER 1-21H1 | CONTINENTAL RESOURCES, INC. | Active (A) | 13,202 ft100% |
| LUCY HANSON 15-22 4H | DEVON ENERGY WILLISTON, L.L.C. | Active (A) | 10,566 ft100% |
| Lucy Hanson 15-22 2H | DEVON ENERGY WILLISTON, L.L.C. | Active (A) | 10,174 ft100% |
| LUCY HANSON 15-22 1-H | DEVON ENERGY WILLISTON, L.L.C. | Active (A) | 10,028 ft100% |
| Lucy Hanson 15-22 XE 1H | DEVON ENERGY WILLISTON, L.L.C. | Active (A) | 9,876 ft100% |
| LUCY HANSON 15-22 3TFH | DEVON ENERGY WILLISTON, L.L.C. | Active (A) | 9,792 ft100% |
| LUCY HANSON 15-22 5TFH | DEVON ENERGY WILLISTON, L.L.C. | Active (A) | 9,665 ft100% |
| LUCY HANSON 15-22 6H | DEVON ENERGY WILLISTON, L.L.C. | Active (A) | 9,564 ft100% |
| GAMMA-STATE 16-15 | CONTINENTAL RESOURCES, INC. | Active (A) | 4,729 ft100% |
| NASHVILLE 5-21H | CONTINENTAL RESOURCES, INC. | Active (A) | 2,167 ft17% |
| NASHVILLE 4-21H1 | CONTINENTAL RESOURCES, INC. | Active (A) | 2,048 ft17% |
| MARYLAND 5-16H | CONTINENTAL RESOURCES, INC. | Active (A) | 1,927 ft16% |
| NASHVILLE 3-21H | CONTINENTAL RESOURCES, INC. | Active (A) | 1,868 ft15% |
| NASHVILLE 2-21H | CONTINENTAL RESOURCES, INC. | Active (A) | 1,845 ft15% |
| MARYLAND 4-16H1 | CONTINENTAL RESOURCES, INC. | Active (A) | 1,780 ft15% |
| MARYLAND 3-16H | CONTINENTAL RESOURCES, INC. | Active (A) | 1,621 ft14% |
| MARYLAND 2-16H | CONTINENTAL RESOURCES, INC. | Active (A) | 1,319 ft11% |
Surveyed Bakken-system laterals with at least 660 ft of plan-view length inside the published footprint. Geometric membership, not a legal assignment; a lateral can cross several units.
Order history
- Order 25009Case 22674Established the spacing unitSTATOIL OIL AND GAS LP
- Order 25393Case 23060Pooled all interests in the unitSTATOIL OIL & GAS LP
- Order 23687Case 21379Designated the spacing unitCONTINENTAL RESOURCES, INC.
- Order 34500Case 31764Designated the spacing unitCONTINENTAL RESOURCES, INC.
Facts extracted from signed NDIC orders whose land description covers this footprint; machine-extracted and not human-reviewed. A stated allowance is what that order allowed, not proof that it governs today.
Overlapping units
10 other units share a surveyed well with this one; overlapping units are not additive.
- T154N R100W sections 16, 17, 18, 19, 20, 21 3,200-acre Bakken spacing unit
- T154N R101W sections 13, 24 2,560-acre Bakken spacing unit
- T154N R100W sections 14, 15, 22, 23 2,560-acre Bakken spacing unit
- T154N R100W sections 16, 21 1,280-acre Bakken spacing unit
- T154N R100W sections 19, 20, 21, 28, 29, 30 3,200-acre Bakken spacing unit
- T154N R100W sections 7, 8, 9, 16, 17, 18 3,200-acre Bakken spacing unit
- T154N R100W sections 19, 20, 21 1,600-acre Bakken spacing unit
- T154N R100W section 16 640-acre Bakken spacing unit
- T154N R100W sections 15, 22 1,280-acre Bakken spacing unit
- T154N R100W sections 16, 17, 18 1,600-acre Bakken spacing unit